Blog

"If opporunity doesn't knock, build a door."

Introduction (originally posted February 25) Considering Opportunities Before the Design Stage (originally posted May 3) Site Selection Consultation (originally posted May 11) Advanced Planning For Commerce (originally posted May 18) Feasibility Studies (originally posted May 25) … Read More

Date: 7/11/19 Location: 1704 N Honore Ave, Sarasota Meeting called to order at: 11:51 AM AIBD officers: Chair: Ren Carotti Vice Chair: Jenni Lewis Secretary: Paul Glaser AIBD members present: Doug Shepard, Kevin Lovley NON-AIBD Members … Read More

Photo of Bernie Kern drawing at a desk.

A home can waste 1000’s of $$ in energy over its lifetime if the attic isn’t insulated properly. Click here to get free design details for attic insulation:

We all have methods and practices when we dimension a plan but do the sub-contractors know your methods and practices or more importantly care to know?

For the second month in a row, the RDIndex has risen by one point.Moreover, the numbers indicate that the industry is increasing their staff, either by direct hires or by subcontracting. Just in time, building designers are … Read More